- Region
- Águilas
- Alhama de Murcia
- Jumilla
- Lorca
- Los Alcázares
- Mazarrón
- San Javier
-
ALL AREAS & TOWNS
- AREAS
- SOUTH WEST
- MAR MENOR
- MURCIA CITY & CENTRAL
- NORTH & NORTH WEST
- TOWNS
- Abanilla
- Abarán
- Aguilas
- Alamillo
- Alcantarilla
- Aledo
- Alhama de Murcia
- Archena
- Balsicas
- Blanca
- Bolnuevo
- Bullas
- Cañadas del Romero
- Cabo de Palos
- Calasparra
- Camping Bolnuevo
- Campo De Ricote
- Camposol
- Canada De La Lena
- Caravaca de la Cruz
- Cartagena
- Cehegin
- Ceuti
- Cieza
- Condado de Alhama
- Corvera
- Costa Cálida
- Cuevas De Almanzora
- Cuevas de Reyllo
- El Carmoli
- El Mojon
- El Molino (Puerto Lumbreras)
- El Pareton / Cantareros
- El Raso
- El Valle Golf Resort
- Fortuna
- Fuente Alamo
- Hacienda del Alamo Golf Resort
- Hacienda Riquelme Golf Resort
- Isla Plana
- Islas Menores & Mar de Cristal
- Jumilla
- La Azohia
- La Charca
- La Manga Club
- La Manga del Mar Menor
- La Pinilla
- La Puebla
- La Torre
- La Torre Golf Resort
- La Unión
- Las Palas
- Las Ramblas
- Las Ramblas Golf
- Las Torres de Cotillas
- Leiva
- Librilla
- Lo Pagan
- Lo Santiago
- Lorca
- Lorquí
- Los Alcázares
- Los Balcones
- Los Belones
- Los Canovas
- Los Nietos
- Los Perez (Tallante)
- Los Urrutias
- Los Ventorrillos
- Mar De Cristal
- Mar Menor
- Mar Menor Golf Resort
- Mazarrón
- Mazarrón Country Club
- Molina de Segura
- Moratalla
- Mula
- Murcia City
- Murcia Property
- Pareton
- Peraleja Golf Resort
- Perin
- Pilar de la Horadada
- Pinar de Campoverde
- Pinoso
- Playa Honda
- Playa Honda / Playa Paraíso
- Pliego
- Portmán
- Pozo Estrecho
- Puerto de Mazarrón
- Puerto Lumbreras
- Puntas De Calnegre
- Region of Murcia
- Ricote
- Roda
- Roldan
- Roldan and Lo Ferro
- San Javier
- San Pedro del Pinatar
- Santiago de la Ribera
- Sierra Espuña
- Sucina
- Tallante
- Terrazas de la Torre Golf Resort
- Torre Pacheco
- Totana
- What's On Weekly Bulletin
- Yecla
- EDITIONS: Spanish News Today Alicante Today Andalucia Today
Date Published: 08/09/2023
Murcia trains to Valencia and Barcelona will now take 25 minutes longer
Rail traffic will be diverted to a single track so significant delays are expected for the next 2 years
Passengers travelling to Barcelona on either of the two daily trains in each direction that connect the Region of Murcia with Spain’s second city will take 20 to 25 minutes longer to reach their destination as of this Saturday September 9.
This is due to work that is being carried out by Spanish railway infrastructure management company Adif between the junction of La Encina and the Valencian town of Xàtiva, work that is necessary in order to complete the route of the high-speed AVE line to the border with France.
While this work is taking place, the trains will be diverted along a 45-kilometre single-line track where all rail traffic between Alicante, Valencia and Catalonia will converge. For that reason, long delays are to be expected, and it estimated that these works may take up to two years to complete.
The delays caused by the concentration of trains running in both directions on the section from Xàtiva to La Encina will also affect trains connecting Murcia with Valencia.
Sources from rail operator Renfe have explained that the company has not considered modifying the train timetables, and that it is not known exactly how long the journey will take on each route.
When the work is finished, the AVE journey time from Murcia to Valencia will be reduced to one and a half hours, while it will be possible to reach Barcelona in about three and a half hours.
This section is on the border between the provinces of Alicante and Valencia, where there are still some 40 kilometres of Iberian gauge track, which cannot accommodate the AVE, which requires European gauge.
Adif is building an international gauge bypass parallel to the current route.
As reported last August, as of this Saturday it will put into service an Iberian gauge section between Xàtiva and the Nudo de la Encina which “will absorb all the traffic while the works to adapt the current double-track route to international gauge (the second phase) are being carried out, which will enable the southeast of the peninsula to be connected to Europe by high-speed rail through the Mediterranean Corridor”.
Image: ADIF
Loading
Sign up for the Spanish News Today Editors Roundup Weekly Bulletin and get an email with all the week’s news straight to your inbox
Special offer: Subscribe now for 25% off (36.95 euros for 48 Bulletins)
OR
you can sign up to our FREE weekly roundup!
Read some of our recent bulletins:
25% Discount Special Offer subscription:
36.95€ for 48 Editor’s Weekly News Roundup bulletins!
Please CLICK THE BUTTON to subscribe.
(List price 3 months 12 Bulletins)
Read more stories from around Spain:
Contact Spanish News Today: Editorial 966 260 896 /
Office 968 018 268